After many years of dealing with carpet, and as part of an over all facility upgrade, Harvest Bible Chapel wanted an upgraded finish to the lobby of their church: they wanted a polished concrete floor.
However, due to the condition of the floor, polishing the existing concrete would not provide the look they wanted. Replacing the concrete was not an option since there was finished space below the floor. Bomanite Micro-Top was chosen as the best option to give a fresh, uniform look. Colors and finishes were selected through a sampling process.
Shotblasting of the entire surface and patching the damaged sections of floor with Bomanite Repair Mortar set the stage for a successful project. Troweling of the Bomanite Micro-Top produced a variegated color that pleased all the parties involved.
Denver, CO
Harvest Bible Chapel
Church Facility Solutions
April 2017
4,000
Bomanite Toppings Systems - Bomanite Micro-Top Light Gray
Colorado Hardscapes, Inc.
9000 E Chenango Ave. Suite 200
Greenwood Village, CO 80111
TEL: 303-750-8200
FAX: 303-750-8886
Email: info@coloradohardscapes.com
Website: www.coloradohardscapes.com