Description:

Due to an issue with extensive epoxy bubbling and delamination, Central Unified School District was interested in removing and replacing a large portion of the existing pool deck around the competition, activity and receiving pools and replacing it with a solid surface with a non-slip finish.

Bomanite Licensee, Heritage Bomanite bid and won the job and proposed a Bomanite Sandscape Texture Exposed Aggregate finish due to its durability and non-slip qualities. The district accepted Heritage Bomanite’s suggestion after examining the on-site samples that were poured. Work progressed for just under three months during which a wide array of work was completed, including the installation of over 13,000 SF of Bomanite Sandscape concrete with an exposed sand finish.

The complete scope of work included the demolition and removal of the existing epoxy coated concrete, the installation of 550 LF of 2’ cantilevered nose around the competition pool, replacing the slot drains with 1045 LF of PolyCast drain with removable tops, the installation of 2600 LF of self leveling joint sealant and 84 LF of non-sag underwater joint sealant, the installation of all depth marker and water polo tiles, and the installation of over 90 anchors for various diving platforms, hand rails, and water polo goals and stanchions.

PHOTO GALLERY

LOCATION

Fresno, CA

CLIENT

Central Unified School District

GENERAL CONTRACTOR

Harris Construction

INSTALL COMPLETED

May 2012

SQUARE FEET

13,000

BOMANITE SYSTEMS

Bomanite Exposed Aggregate Systems - Bomanite Sandscape® Texture

BOMANITE LICENSED CONTRACTOR

Heritage Bomanite
5651 E. Fountain Way
Fresno, CA 93727
TEL: 559-291-0506
FAX: 559-291-0515
Website: www.heritagebomanite.com
Email: contact@heritagebomanite.com